Drying Equipment Operation And Attention
Time: 2016-09-29 20:00:52Phone/Wechat: 156-7062-6070Author: Dingli
Guide:Drying equipment:

1.Combined with magnetic starter to send electricity.

2.Press the button to open two or three times.

...

Drying equipment:

1.Combined with magnetic starter to send electricity.

2.Press the button to open two or three times.

3.Loaders and crushers to work together.

4.Check without exception, send out signal.

5.In operation, the mechanical and electric motors should be no vibration, sound and humidity should be normal, the bearing temperature is not more than 75℃, the motor temperature shall not exceed the manufacturer's requirements.

6.The chain of the machine must be consistent. Under full load conditions, the tightness of the chain volume does not allow more than two chain length, no card chain and chain jumping phenomenon.

7. When the fusible plug or easy chip is damaged, we cannot replace wood or other materials.

8.The safety device of the machine shall be kept in good condition, and shall be checked frequently in the work process, if any damage should be stopped immediately.

9.Must ensure that the safety device of the machine is in good condition.

10.Move the loaders.

Welcome to Dingli company consult drying equipment.
 

E-mail: dingliwyt@gmail.com
Wechat/WhatsApp/Skype:156-7062-3070
Add: No.12 Hongye Road HI-TECH Develop-ment Zone, Zhengzhou,China
Zhengzhou Dingli New Energy Equipment Co.,Ltd
Home | Products | Case | About Us | Contact Us     |     sitemap.xml